Skip to content
Corpshore Philippines
Case studiesIT outsourcingBonifacio Global City (BGC), Metro Manila

Dedicated Full-Stack Development Pod for a UK Fintech Scaleup

41 pts

Sprint Velocity

Daily

Deployment Frequency

1.6 hrs

Mean Time to Recovery

4%

Change Failure Rate

The challenge

  • In-house team of 12 unable to keep pace with an accelerating product roadmap ahead of Series C fundraising
  • A 4-month feature backlog blocking key Series B commitments and investor milestones
  • Release deployment cycles taking 3 to 5 days per production release, limiting iteration velocity
  • Difficulty recruiting mid-senior full-stack engineers in the UK market at sustainable compensation levels
  • Investor pressure to demonstrate a step-change in engineering velocity before the Series C round

The Corpshore approach

  • Assembled a dedicated engineering pod with a Tech Lead reporting directly into the client CTO for governance clarity
  • Implemented a CI/CD pipeline with automated testing (Jest for unit, Cypress for E2E) reducing manual regression
  • Deployed weekly cross-timezone syncs and daily standups aligned with the client's UK-based team
  • Introduced a feature flag deployment strategy enabling safer rollouts and instant rollback capability
  • Established shared Notion, Linear and GitHub environments for full transparency and unified velocity tracking

Results and impact

MetricBeforeAfterChange
Sprint Velocity28 pts41 pts+47%
Deployment FrequencyWeeklyDaily3x increase
Mean Time to Recovery4.2 hrs1.6 hrs-62%
Change Failure Rate18%4%-14 points
Feature Backlog4 monthsCurrentCleared in 6 months
Test Coverage48%84%+36 points
The BGC team ships like a colocated team. The velocity difference before and after is what unlocked our Series C.
Chief Technology Officer, Anonymized Client